Proposed Solar Farm at Whappstown Road, Ballymena

16 November 2018

The Department for Infrastructure was withdrawn its notice of opinion to refuse planning permission and its request to the Commission to conduct a hearing.

The hearing which was arranged for 29th November 2018 has therefore been cancelled.